We renovate occupied Florida facilities without shutting them down.

Schools, hotels, transit, retail, and public buildings. We phase the work around your calendar and your people, keep life safety intact every day, and hand each space back on a date, not a guess.

North Tampa Behavioral Health Hospital wrapped in new weather barrier during exterior restoration, crew at work, blue sky reflected in the pond in front.
North Tampa Behavioral Health Hospital. Full exterior restoration after hurricane damage, with patients in care the entire time.

Maloney Construction is a commercial general contractor built for facilities that cannot close. Our roots are in disaster recovery, where keeping the client operating is the entire job. That discipline now runs through everything we build.

Same classroom. School in session the whole time.

Drag through a ceiling and lighting replacement on an occupied campus. Floor protection goes down first and stays down until the room is handed back.

Classroom with ceiling removed to the deck, scaffold in place, floors fully covered in protective paper and tape. New ceiling grid installed and wiring dropped, floor protection still in place. Ceiling tile installed, openings ready for new light fixtures. Finished classroom with new LED lighting on, ready for handback.
ProtectContainment up, floor protection down, egress and alarms maintained

How an occupied job runs

Slide to move through the phases. Each one maps to part of our delivery system.

  1. Protect
  2. Sequence
  3. Build
  4. Turn over
  • Containment and protectionDust, noise, and air controls with secure separation between construction and operations.
  • Life safety maintainedInterim egress, alarm, and fire-protection continuity for every phase, every day.
  • Phased sequencingWork scheduled around calendars, occupancy, and service windows — summer surges, night and weekend crews.
  • Daily operator coordinationOne plan shared with facilities staff before work starts, not after questions do.
  • Area-by-area turnoverClean, punched, documented handback so each space returns to service on a date, not a guess.

One wall. Guests on this side, renovation on that side.

A Marriott lobby renovation in Ocala, photographed from both sides of the same containment wall. The hotel never stopped checking guests in.

Hotel lobby in use: guests' seating and dining tables set up directly against a clean modular containment wall with a signed access door. The work side of the same wall: negative-air machines ducted through sealed panels, kraft paper on the floor, renovation underway.
Guest side

Sealed modular containment panels with a dedicated, signed entry. On the work side, negative-air machines pull dust and odor through the wall and out, so the lobby side stays clean enough to serve breakfast.

The seating in the guest-side photo is the hotel's own lounge furniture, in use during the project.

A new office, built in a live hallway.

New partition walls and an office framed, hung, finished, and painted inside a school corridor while the exit route stayed open and the classrooms around it stayed in use. The floor tile you see is the original — it never left service.

Drag the handle to compare. Every photo on this page is from a Maloney jobsite.

Representative work

Public, hospitality, and commercial renovation across Florida, delivered while the building kept doing its job.

Canopy underside stripped to bare steel structure, lift in position. Finished white soffit under the canopy with the bus bay sign lit.
LeeTran / Lee County · B260017SML

Transit facility modernization, four operating stations

Canopy re-roofing, soffit replacement, and site work at park-and-ride and transfer facilities while routes kept running. Bus bays stayed signed and in service. Delivered under public procurement with AIA G702/G703 progress billing and Davis-Bacon certified payroll. Substantial completion November 2026.

Telehandler lifting a canopy panel behind caution tape while the park-and-ride stays open behind it.
LeeTran Beach Park & Ride

Site control around a live station

Perimeter taped, lifts staged clear of the bays, riders still on the benches in the background.

Finished classroom with new ceiling and LED lighting.
Charlotte County Public Schools · ITN 2627-45MR

District-wide term contract, 26 campuses

Awarded June 2026; ranked first in 14 of 17 work categories. Reactive and planned renovation work orders on occupied campuses, run through our own work-order platform.

Metal stud framing for a new office wall beside a lit exit door in a school corridor, shop vacuum in place.
Occupied K-12 campus

Corridor office build-out

Framing to paint in a live hallway. Dust extraction at the source, exit path never blocked.

LeeTran Beach Park and Ride before work, with faded red canopy roofs.
LeeTran Beach Park & Ride

Before: faded canopies, active station

The starting point: worn roofing and fascia on a station that could not close for the work.

New blue standing-seam canopy roof, fascia, and downspout against fresh stucco.
LeeTran Beach Park & Ride

After: new roof, fascia, and drainage

Standing-seam metal, new gutters and downspouts, stucco repaired and coated.

Hotel meeting room mid-renovation: walls patched and primed, new carpet rolled and waiting, air scrubbers running. The same meeting room with new patterned carpet installed, walls finished, containment still sealing the doorway.
Ocala, Florida · Marriott PIPs

Meeting room, floor to ceiling, with the hotel open around it

Carpet, wall finishes, and lighting brought to brand standard behind sealed doors and negative air. The corridor outside stayed a guest corridor the entire time.

New patterned carpet being rolled out over the old flooring in a hotel guest corridor, air scrubber at the edge of the work zone.
Ocala, Florida · Marriott PIPs

Guest corridors, one wing at a time

New carpet and wall finishes run wing by wing so the rest of the floor stays rentable.

Hotel lobby bar fully wrapped in protective sheeting, taped at the ceiling line, with the lobby carpet and pendant lights intact.
Ocala, Florida · Marriott PIPs

Courtyard and Residence Inn, concurrent renovations

Brand-mandated renovations executed while both hotels stayed open to guests. Guestroom and public-area work sequenced to Marriott standard.

Hotel lobby open to guests during renovation, luggage carts staged and seating in use, with air scrubbers tucked against the wall.
Ocala, Florida · Marriott PIPs

Lobby open through the work

Luggage carts staged, seating in use, air scrubbers running against the wall. Guests check in; the schedule holds.

Modular containment wall being assembled across a hotel lobby, with a lockable access door and plastic sheeting sealing the far end.
Ocala, Florida · Marriott PIPs

Containment goes up first

Modular panels, a lockable access door, and sealed transitions before the first piece of demolition comes out.

Hospital exterior at dusk mid-restoration: new weather barrier on the end wall, siding going on, and lights on in the occupied rooms. Finished hospital entrance canopy with new siding and trim after the exterior restoration.
North Tampa Behavioral Health Hospital · hurricane recovery

Rebuilding a hospital's exterior envelope with patients inside

Full exterior restoration after hurricane damage: compromised siding removed, a new water barrier system installed, and Hardie siding replaced, on an operating behavioral health facility that could not pause care. Look at the windows in the "During" photo: the lights are on. Project page

Close view of new white and tan Hardie siding and trim on the hospital exterior at sunset.
North Tampa Behavioral Health Hospital

New envelope, ready for the next season

Weather-resistant barrier, new Hardie siding, and trim, detailed to keep water out for the long term.

Church sanctuary mid-renovation: subfloor exposed, new carpet rolled and staged, lit stone altar wall and cross at the far end. Finished worship hall with new gray carpet, refurbished wood pews, fresh paint, and the lit stone altar wall.
North Port, Florida · church · storm damage

Storm-damaged church, back to Sunday service

Storm-damage renovation: full roof replacement, new windows and exterior doors, then the worship hall brought back with new carpet, refurbished pews, repaired ceilings, and paint, sequenced around the congregation's calendar. Project page

New carpet wrapped cleanly over the altar steps beside the wooden pulpit with its purple parament.
North Port, Florida · church

The details a congregation notices

Carpet wrapped tight over every step and nosing, pulpit and paraments back in place before the first service.

Salon storefront mid-rebuild: floors under protective paper and tape, walls patched, street visible through the front glass. Finished salon storefront with new wood-look tile floors, pendant lighting, pressed-tin ceiling, and stained-glass transoms.
Punta Gorda, Florida · retail salon · disaster recovery

Storm-damaged salon, rebuilt to reopen

Full interior rebuild after storm damage: new floors, drywall, trim, cabinetry, lighting, insulation, plumbing, and electrical, with the original pressed-tin ceiling and stained glass kept. Project page

Wide view of the finished salon interior: wood-look tile, chair rail, pendant clusters, and new cabinetry ready for fit-out.
Punta Gorda, Florida · retail salon

Ready for chairs, mirrors, and customers

Tenant-ready finish: floors, lighting, and cabinetry complete, ready for the owner's fit-out.

Why owners choose Maloney

The contractor that wins the second job is the one that made the first one easy to live with.

Continuity is the deliverable

Your students learn, your guests sleep, your public is served, while we work.

Speed to a real number

An AI-assisted estimating platform built in-house turns plans into a credible budget in days, not weeks.

Public-grade administration

AIA billing, certified payroll, purchase-order and work-order compliance. And a written rule: no change-order work proceeds without written authorization.

Program infrastructure

A custom operations platform manages multi-site work orders, daily logs, and invoice compliance in real time.

Principal-led

Direct access to ownership on every account, from first walk to closeout.

Bonded and insured

Florida Certified Building Contractor CBC 1266638. Surety capacity statement available on request.

Start with a 15-minute call

Tell us about the facility and what can't stop. We'll tell you how we'd phase it, and whether we're the right fit.

Or reach Paul Maloney directly: 941-979-2773 · paul@maloney.construction

Quick facts

  • EntityMaloney Construction LLC — Port Charlotte & Miami, Florida. Serving Florida statewide.
  • LicenseFlorida Certified Building Contractor CBC 1266638
  • NAICS236220 Commercial & Institutional Building Construction
  • UEI / DUNSH6X5EHMFAGB1 / 10-992-0586
  • BondingBonded and insured; surety capacity statement on request
  • MarketsK-12 and public facilities, hospitality, transit, retail, disaster recovery